Rail transportation has many advantages: moving of passengers and cargo to ease pressure on our roads; transporting raw materials to the ports, etc.
HE John Mahama based on these advantages committed to the redevelopment of the railway sub-sector in line with his government’s completion of the Ghana Railway Master Plan.
The plan entails the reconstruction and modernisation of the existing rail network in the southern half of the country to be followed by the extension of rail lines to the northern half.
In line with this, work on the Sekondi-Takoradi through Kojokrom railway line was completed. In addition, a modern train station was completed at Sekondi. Work also started and completed on the Takoradi and Butuah Train Stations. Surburban rail services began on the Takoradi to Sekondi line, through Kojokrom in 2016 to ease the ever-increasing road congestion and reduce travel time between the twin cities.
The Ghana Railway Company deployed new air-conditioned diesel multiple train units on the line. The Front End Engineering Design (FEED) for the Western Railway Line from Takoradi to Kumasi with a branch line from Dunkwa to Awaso was completed. FEED for the Eastern Railway from Tema through Accra to Kumasi commenced in phases and the Accra to Nsawam stretch began.
Anthony Obeng Afrane
The United States Embassy in Accra has announced plans to introduce a new arrangement aimed… Read More
A new nationwide survey by the Institute of Economic Affairs (IEA) indicates that most Ghanaians… Read More
Star Oil Limited has announced the immediate suspension of its membership in the Chamber of… Read More
NAIMOS has intensified its fight against illegal mining at some parts of the Ahafo Region,… Read More
Former Finance Minister Ken Ofori-Atta is scheduled to appear before a court in the United… Read More
The Deputy Chief Executive Officer of the Gaming Commission of Ghana, Lamtiig Apanga, has advised… Read More